Would you utilize the SUM data validation option for cell i19 to ensure that the entry does not exceed the required total of 350 is ($I$13:$I19)<=350
what is data validation ?Before using, importing, or otherwise processing data, it is necessary to validate its correctness and quality. Depending on the restrictions or goals of the destination, various validation techniques might be used. Data cleansing might take the form of data validation.
calculation
the maximum number of points that can be granted in the class is 350.
What data validation setting would you use for cell l19 to ensure that the entry
= does not exceed the necessary total of 350 = SUM($l$13:$l19)
= SUM($l$13:$l19)<=350
Would you utilize the SUM data validation option for cell i19 to ensure that the entry does not exceed the required total of 350 is ($I$13:$I19)<=350
To know more about data validation visit :-
https://brainly.com/question/29033397
#SPJ4
Tell whether the equation has one, zero, or infinitely many solutions 8(x – 5) + 36 = 7x – 2
Answer:
jroteejktrsafh❤️♥️❣️❣️♥️♥️☘️
Fuzzy draws a segment of positive length in a plane. How many locations can Fuzzy place another point in the same plane to form a non-degenerate isosceles right triangle with vertices consisting of his new point and the endpoints of the segment?
Answer: 2 locations.
Step-by-step explanation:
A non-degenerate triangle means that the 3 vertices are no colinear, so we can not draw the other point in top of the segment.
Now, if we want to construct an isosceles triangle, then we must start for the middle of the segment, now we draw a line that cuts perpendicularly our segment by that point (by the middle).
Now, any point in that line is at the same distance from both ends of our triangle.
now the angle between those two new sides must be 90°, (because this is a right triangle) so we have, for each side of our segment, a unique location such that the end result is a non-degenerate isosceles triangle.
So we have 2 locations
Solve for a side in right triangles
Answer:
BC= 1.7101
Step-by-step explanation:
The following is one way to perform the calculation. It may not be the best way.
Let a represent line BC, and b represent line CA, and c represent line AB.
b = c × sin(β)
= 4.69846
\(a = \sqrt{c^{2} -b^{2} } = \sqrt{52 - 4.69846310392952}= \sqrt{ 2.9244444610128} = 1.7101\)
A card is picked at random from a deck. How do we interpret this notation: P(the number on the card is odd | the card is not a 7) Group of answer choices
1. We know the card is odd, and we want the chance of it not being a 7
2. We know that the card picked is not a 7, and we want the chance of it being odd
3. We want the chance of the card being both odd and not a 7
The answer is b) We know that the card picked is not a 7, and we want the chance of it being odd
Explanation
Probability is a branch of mathematics that deals with the calculation of the possibility of an event occurring.
When a card is picked at random from a deck, this notation P(the number on the card is odd | the card is not a 7) means "We know that the card picked is not a 7, and we want the chance of it being odd.
"In other words, we are interested in the probability of drawing an odd number, given that the card drawn is not a 7. This can be written as:P(Odd Number | Not a 7)
The probability of an odd number being drawn is 20/52, or 5/13, since there are 20 odd-numbered cards in the deck, and there are 52 total cards.
The probability of drawing a 7 is 4/52, or 1/13, since there are 4 7s in the deck.
Because we know that the card is not a 7, the probability of the card being an odd number is given by:
P(Odd Number) = P(Odd Number | Not a 7) = (5/13) / (1 - 1/13) = 5/12
Therefore, the answer is 2. We know that the card picked is not a 7, and we want the chance of it being odd.
Learn more about conditional probablity : https://brainly.com/question/10567654
#SPJ11
someone please help.........
Answer:
i think its 1/16
Step-by-step explanation:
Niya worked for 5 13 hours and earned $77 at her job. What is Niya's pay rate in dollars per hour?
Answer:
5 doallar an hour
Step-by-step explanation:
adddasdda
Answer:
$14
Step-by-step explanation:
77 divided by 5.5 (which is 5 and 1/2)
77/5.5
$14 per hour
what is the surface area of a conical grain storage tank that has a height of 42 meters and a diameter of 24 meters
The surface area of a conical grain storage tank that has a height of 42 meters and a diameter of 24 meters is 1,670.5 square meters.
The surface area of a cone is calculated using the following formula:
Surface area = πr² + πrl, where π is approximately equal to 3.14, r is the radius of the base of the cone, and l is the slant height of the cone.
In this problem, we are given that the height of the cone is 42 meters and the diameter of the base is 24 meters. The radius of the base is half of the diameter, so the radius is 12 meters. The slant height of the cone can be calculated using the Pythagorean theorem.
l² = 12² + 42²
l² = 1764
l = 42.01 meters
The surface area of the cone is then calculated as follows:
Surface area = πr² + πrl
Surface area = 3.14 * 12² + 3.14 * 12 * 42.01
Surface area = 1,670.5 square meters
Here are some additional explanations:
The radius of a circle is the distance from the center of the circle to any point on the edge of the circle.The slant height of a cone is the distance from the vertex of the cone to any point on the edge of the base of the cone.The surface area of a cone is calculated by adding the area of the base of the cone and the area of the lateral surface of the cone.The area of the base of a cone is calculated using the formula πr².The area of the lateral surface of a cone is calculated using the formula πrl.To know more about area click here
brainly.com/question/13194650
#SPJ11
convert 2000 feet per minute to miles per hour
Rachel is driving at 48mph. She sees an accident directly ahead of her about 200 feet away. Will she be able to stop in time?
The area of a garden is 30 square feet. The perimeter is 26 feet. What are the measurements of each side?
Answer:
So there are two possibilities:
x = 3, y = 10
x = 10, y = 3
Step-by-step explanation:
Make two equations:
Length = x
Width = y
xy = 30
2x + 2y = 26
You can simplify the second equation to:
x + y = 13
x = 13 - y
(13 - y) * y = 30
13y - y^2 = 30
y^2 - 13y + 30 = 0
Factor:
(y - 3)(y - 10) = 0
y = 3, y = 10
So there are two possibilities:
x = 3, y = 10
x = 10, y = 3
a penny is dropped into a well. it takes 5 seconds to fall. calculate the depth of the well in feet. choose... ft
The calculated depth of the well in feet is 402.5 feet
How to calculate the depth of the well in feetFrom the question, we have the following parameters that can be used in our computation:
Time, t = 5 seconds
The depth of the well in feet is calculated as
d = 1/2gt²
substitute the known values in the above equation, so, we have the following representation
d = 1/2 * 32.2 * 5²
Evaluate
d = 402.5
Hence, the depth is 402.5 feet
Read more about height functions at
https://brainly.com/question/10837575
#SPJ4
2 kg mass is placed at the end of a lever which is 20 cm from the pivoting point. If the mass is transferred to other side of the lever which is 10 cm from the pivot, then what will be the effective mass? a. 2 kg b. 20 kg c. 8 kg d. 25 kg
The effective mass on the opposite end of the lever is 4 kg and distance is given, which is incorrect as option D is 25 kg otherwise all option is correct .
In the given scenario, a 2 kg mass is placed at the end of a lever, which is 20 cm from the pivoting point. If the mass is transferred to the other side of the lever, which is 10 cm from the pivot,
Let's find out.The effective mass on the opposite end of the lever can be found using the following formula:
= Mass × distance of its center of gravity from the pivot
Let M be the effective mass that we have to find. Then, we have:
2 kg × 20 cm
= M × 10 cm40 cm
= 10 M4
= MM
= 4
Therefore, the effective mass is 4 kg. Hence, option D. 25 kg is incorrect as the effective mass is 4 kg.
To know more about effective mass Visit:
https://brainly.com/question/2124323
#SPJ11
Mr. Seidel puts colored markers in a box (5 green, 6 black, and 1 red) and will have students pick one and record the color. How many times do you think it will take until the red marker has been picked 5 times?
It is expected to take approximately 60 trials until the red marker has been picked 5 times.
In order to determine how many times it will take until the red marker has been picked 5 times, we need to consider the probability of selecting the red marker in each trial and the concept of expected value.
Initially, the probability of picking the red marker is 1 out of 12, since there are 12 markers in total (5 green + 6 black + 1 red). Therefore, on average, we would expect to select the red marker once every 12 trials.
However, we want to find out how many trials it will take until the red marker has been picked 5 times. This situation can be modeled as a binomial distribution, where each trial has two possible outcomes: success (selecting the red marker) or failure (selecting any other color). The probability of success (p) is 1/12, and we want to find the number of trials (n) until we have 5 successes.
The expected value of a binomial distribution can be calculated using the formula E(X) = np, where E(X) represents the expected value and n is the number of trials. In this case, we want to solve for n, so we rearrange the formula as n = E(X) / p.
Using this formula, we can calculate the expected number of trials until the red marker is picked 5 times:
n = (5 / (1/12)) = 60
Therefore, it is expected to take approximately 60 trials until the red marker has been picked 5 times.
For more question on picked visit:
https://brainly.com/question/31896987
#SPJ8
What is an equation of the line that passes through the point (5,−2) and is parallel to the line 2x-5y=35?
Find the slope of the given line
If we put the line 2x - 5y = 35 into the y = mx + c form, the coefficient of x (m) is the slope.
since 2x - 5y = 35
⇒ 5y = 2x - 35
y = ²/₅ x - 7
∴ the slope of the line is ²/₅
Identify the slope of the parallel line
When two lines are parallel, they have the same slope.
∴ the slope of the parallel is also ²/₅
Determine the equation of the parallel line
We can now use the point-slope form (y - y₁) = m(x - x₁)) to write the equation for this line where (x₁ , y₁) is (5,−2) :
y - (-2) = ²/₅ (x - 5)
y + 2 = ²/₅ (x - 5)
If we were to write the equation in the same form as the line that was given:
since y + 2 = ²/₅ (x - 5)
y = ²/₅ x - 2 - 2
y - ²/₅ x = - 4 [multiply through by 5]
5y - 2x = -20
To test my answer, I have included a Desmos Graph that I graphed using the information provided in the question and my answer.
If you were to use the substitution method to solve the following
system, choose the new equation after the expression equivalent to x
from the second equation is substituted into the first equation.
3x + 2y = -21
x-3y = 4 (6 points)
Answer:
Step-by-step explanation:
Making x the subject in the second equation gives:
x = 4+3y
substituting x = 4 +3y into the first one gives:
3(4 + 3y) + 2y = -21
12 + 9y +2y = -21
11y = -33
y = -3
please help me!!!!!!!
Answer:
Step-by-step explanation:
Describe the meaning of the translation (x + 6, y + 10).
All points are moved 6 units right and 10 units up
All points are moved 6 units left and 10 units up
All points are moved 6 units left and 10 units down
All points are moved 6 units right and 10 units down
Answer:
Step-by-step explanation:
The meaning of the translation (x + 6, y + 10) is that all points in a coordinate plane are moved 6 units to the right and 10 units up.
In other words, for any point (x, y) in the original position, after the translation, the new coordinates would be (x + 6, y + 10). This means that the x-coordinate of each point is increased by 6 units, resulting in a shift to the right, and the y-coordinate is increased by 10 units, resulting in a shift upwards.
How do you graph y=-10x+200 ?
Answer:
your slope is -10, and the y-intercept is 200
Step-by-step explanation:
Start at (0,200), or just 200 on the y axis. your slope is -10, or -10/200 in rise over run form. you want to go to the right one, and down 10. So make a dot at (0,200), then (1,190), then (2,180) and so on. to go in the negatives it is the opposite. left one, then up 10, so (-1, 210), then (-2,220) and so on.
SOMEONE PLEASE HELP....
Answer:
Step-by-step explanation:
\((3x+4)(x^2+px+5) \\=3x^3+3px^2+15x+4x^2+4px+20\\=3x^3+(3p+4)x^2+(15+4p)x +20\)
since we know that \(x^2\) in this expansion is \(-23x^{2}\)
thus \(3p+4=-23\\3p=-27\\p=-9\)
Hope that helps!
PLEASE HELP I WILL MARK YOU THE BRAINIEST Using the graph, identify the slope and y-intercept. Then write an equation that represents the linear relationship.
Answer:
slope = -2
y-intercept = 2
equation: y = -2x + 2
Step-by-step explanation:
The equation of a line is
y = mx + b
We need to find the slope, m, and the y-intercept, b.
The graph crosses the y-axis at y = 2, so the y-intercept, b, equals 2.
Now we have
y = mx + 2
slope = m = rise/run
We see points (1, 0) and (0, 2) on the graph. Starting at (1, 0), we go up 2 units. That is a rise of 2. Then we go 1 unit left. That is a run of -1.
slope = m = rise/run = 2/(-1) = -2
The slope is -2.
The equation is
y = -2x + 2
Answer:
y=-2x+2
Step-by-step explanation:
Using rise over run the line travels down 2 and right one from one point to another giving u -2/1 or -2 as the slope and it passes through the y-axis at 2 giving you a y-intercept of 2 and the equation y=-2x+2.
Please answer it now in two minutes
Answer:
0.9
Step-by-step explanation:
This is a sine triangle. We have the hypotenuse (7) and an angle opposite of x (6). The formula for sine is opposite/hypotenuse; 6/7 = 0.8571428571428571. This, rounded to the nearest tenth, is 0.9.
Answer:
59 degrees
Step-by-step explanation:
Sin = opposite / hypotenuse
In this case sin is 6/7
To find the angle of this we need to use the arcsin, or sin^-1 function
Arcsin(6/7) = 58.9972809 degrees
This gets rounded to 59 degrees
20 POINTS
what is the vertex of this quadratic function
Answer:
(-4,-9)
Step-by-step explanation:
vertex form: y=a(x-h)^2+k
hk=vertex of x and y
inside parentheses=horizontal (opposite signs)
that’s why it’s -4 instead of 4 for h (x) while -9 stays the same since it’s not inside the parentheses
who is the queen of rap and please state your reason.
(its an assignment)
Answer:
I DON'T KNOW WHO so what is yours
please help me solve this
Explanation:
The proof can be had by making use of the AAS congruence postulate (twice) and CPCTC.
We start by showing ΔPQY≅ΔPRX, then by showing ΔXQN≅ΔYRN. The proof is then a result of CPCTC.
Proof1. PQ≅PR, ∠Q≅∠R . . . . given
2. ∠P≅∠P . . . . reflexive property of congruence
3. ΔPQY≅ΔPRX . . . . AAS congruence postulate
4. PX≅PY . . . . CPCTC
5. PX+XQ=PQ, PY+YR=PR . . . . segment sum theorem
6. PX+XQ = PY +YR . . . . substitution property
7. PX +XQ = PX +YR . . . . substitution property
8. XQ = YR . . . . subtraction property of equality
9. ∠XNQ≅∠YNR . . . . vertical angles are congruent
10. ΔXNQ≅ΔYNR . . . . AAS congruence postulate
11. XN ≅ YN . . . . CPCTC
__
Additional comment
You probably did steps 1-3 in part (a) of the problem.
There are 550 people at the school carnival.
Part A
If 385 of the people are students, what percentage of the people at the carnival are students?
Part B:
If 30% of all the people at the carnival are on a ride, how many people are on the ride?
Answer:
70% of the people at the fair are students
165 people are on the ride
Step-by-step explanation:
In order to find a percentage, take the fraction given, 385/550, and divide the numerator, 385, and divide it by the denominator, 550. Once completing this, we get 0.7
Next, we multiply the result by 100, and get 70, thus, 385 is 70% of 550.
To find how many people 30% of 550 is, we take the percentage and put it in a fraction with the denominator being 100(changes with size of fraction like a decimal, 300 would be over a denominator of 1000)
With 30/100, we then multiply by 550 with the equation looking like this:
30/100*550/1
Once we finish multiplying(typically using a calculator, although you can do it manually) we get 165, the value of how many people are on rides out of the total 550.
help me I’m bad with this stuff
Answer:
(4x10^1)(2x10^4)
=40^1 × 20^4
=800^5
Answer:
8 x 10^5
Step-by-step explanation:
We can start by grouping the powers of ten together and the other numbers together, as you can move numbers around when multiplying:
4 x 2 x 10^1 x 10^4
4 multiplied by 2 is 8, so we can put that in:
8 x 10^1 x 10^4
Next, using the product rule, 10^1 x 10^4 would be ten to the power of the sum of the two exponents, or 10^(4 + 1), which is 10^5.
We will be left with
8 x 10^5
This is in scientific notation, so no further modification is needed.
One year ago, the ratio of Honey and Piyush ages was 2:3 respectively. After five years from now, this ratio becomes 4:5. How old is Piyush now?
Answer:
eşnatto eşmatoroorlfld
Answer:
Now , Piyush age =3+Honey age
Step-by-step explanation:
Honey age=x
Piyush age=y
1 year ago,Honey age=x-1
Piyush age=y-1
the ratio of Honey and Piyush age=2:3
x-1:y-1=2:3
x-1/y-1=2/3
3(x-1)=2(y-1)
3x-3=2y-2
3x-2y= -2+3
3x-2y=1 eq _1
after 5 years from now,
Honey age=x+5
Piyush age=y+5
the ratio of them=4:5
x+5/y+5=4/5
5(x+5) =4(y+5)
5x+25=4y+20
5x-4y=20-25
5x-4y=-5 _eq2
eq1and 2_
5x-4y= -5
3x-2y= 1
-
2x-2y=-6
x-y =-3
-y=-3-x
y=3+x
Is the question biased or fair?
Do you want to eat a juicy hamburger or the usual vegetable sandwich?
Answer:
biased
Step-by-step explanation:
What is the length of one side of a square if it’s area is 100 square centimeters a: 100 cm b:40cm c: 25 cm d:10 cm
Do you believe that the 4+1 model is applicable to all sizes of projects? Why or why not?
The applicability of the 4+1 model depends on the size and complexity of the project. Smaller projects may not require its full implementation, while larger projects can benefit from its structured approach.
The 4+1 model, also known as the Kruchten's model, is a software architecture design approach that consists of four views (logical, process, development, and physical) and an additional use case view. Whether the 4+1 model is applicable to all sizes of projects depends on the specific context and requirements of each project.For smaller projects with limited complexity and scope, adopting the full 4+1 model may be excessive and unnecessary. It might introduce unnecessary overhead in terms of documentation and development effort. In such cases, a simpler and more lightweight architectural approach may be more suitable, focusing on the essential aspects of the project.
However, for larger and more complex projects, the 4+1 model can provide significant benefits. It offers a structured and comprehensive approach to architectural design, allowing different stakeholders to understand and communicate various aspects of the system effectively. The use of multiple views provides a holistic understanding of the system's architecture, which aids in managing complexity, facilitating modular development, and supporting system evolution.
Ultimately, the applicability of the 4+1 model depends on the project's size, complexity, and the needs of the development team and stakeholders. It is essential to evaluate the project's specific requirements and constraints to determine the appropriate level of architectural modeling and documentation.
To learn more about constraints click here
brainly.com/question/32636996
#SPJ11