The cumulative earned value of the project is the sum of the budgeted costs of the work actually performed.
This is because earned value management (EVM) is a project management technique that measures the actual progress of a project against the planned progress, and the earned value represents the amount of work that has been completed to date.
Earned value is a project management metric used to assess the progress of a project by comparing the actual work completed against the planned work. It involves measuring the value of the work done up to a specific point in time, based on the original budgeted costs.
To know more about budgeted visit:-
https://brainly.com/question/32239394
#SPJ11
The company PureNSafe is designing a portable, solar-powered disinfection system for Army use only. The system is simply an inlet pipe, a pump, a mixing chamber and an outlet pipe. The water is continuously pumped into the chamber where it is irradiated with UV light before it exits through the the appropriate tube into a collection vessel. The disinfection rate constant rate of disinfection with UV light is 7.80 s.1 and the amount of bacteria has to be reduced by 99.9%. be reduced by 99.9%. Since the Army requires an object that can be carried in a backpack, it requires that the chamber of the apparatus must not hold a capacity greater than 2 L. How much water will the system be able to produce during 10 hours of sunshine?
Solution :
The treatment system will operate as the well mixed chamber.
Disinfection rate constant for the UV light, k is 7.80 /s. Number of bacteria in water need to be reduced by 99.9%
Percent reduction of bacteria should be \($(1-10^{0.99}) \times 100 =89.7\%$\)
Volume of the unit chamber is fixed at 2L
Assume the inlet concentration, \($C_0$\) as 1000
The outlet concentration of bacteria, C should be \($1000-\left(1000 \times \frac{89.7}{100}\right)$\)
= 103
The well mixed chamber will then follow a completely mixed flow reactor model.
Compute the time required :
\($t=\frac{1}{k}\left(\frac{C_0}{C}-1\right)$\)
\($t=\frac{1}{7.8}\left(\frac{1000}{103}-1\right)$\)
= 1.115 s
Flow through the system is \($\frac{2 \ L}{1.115 \ s}$\) = 1.79 L/s
The amount of water treated during the 10 hours of sunlight is 1.79 x 10 x 60 x 60 = 64440 L
Air flows steadily and isentropically from standard atmospheric conditions to a receiver pipe through a converging duct. The cross-sectional area of the throat of the converging duct is 0.05 ft2. Determine the mass flowrate in lbm/s through the duct if the receiver pressure is 10 psia.
Answer:
The answer is "0.0728"
Explanation:
Given value:
\(P_0= 14.696\ ps\\\\\ p _{0}= 0.00238 \frac{slue}{ft^{3}}\\\\\ A= 0.05 ft^2\\\\\ T_0= 59^{\circ}f = 518.67R\\\\\ air \ k= 1\\\\ \ cirtical \ pressure ( P^*)=P_0\times \frac{2}{k+1}^{\frac{k}{k-1}}\\\)
\(= 14.696\times (\frac{2}{1.4+1})^{\frac{1.4}{1.4-1}}\\\\=7.763 Psia\\\\\)
if \(P<P^{*} \to\) flow is chocked
if \(P>P^{*} \to\) flow is not chocked
When P= 10 psia < \(P^{*}\) \(\to\) not chocked
match number:
\(\ for \ P= \ 10\ G= \sqrt{\frac{2}{k-1}[(\frac{\ p_{0}}{p})^{\frac{k-1}{k}}-1]}\)
\(= \sqrt{\frac{2}{1.4-1}[(\frac{14.696}{10})^{\frac{1.4-1}{1.4}}-1]}\)
\(M_0=7.625\)
\(p=p_0(1+\frac{k-1}{2} M_0 r)^\frac{1}{1-k}\)
\(=0.00238(1+\frac{1.4-1}{2}0.7625`)^{\frac{1}{1-1.4}}\\\\\ p=0.001808 \frac{slug}{ft^3}\)
\(\ T= T_0(1+\frac{k-1}{2} Ma^r)^{-1}\\\\\ T=518.67(1+\frac{1.4-1}{2} 0.7625^2)^{-1}\\\\\ T=464.6R\\\\\)
\(\ velocity \ of \ sound \ (C)=\sqrt{KRT}\\\\\)
\(=\sqrt{1.4\times1716\times464.6}\\\\=1057 ft^3\\\\\)
R= gas constant=1716
\(m=PAV\\\\\)
\(=0.001808\times0.05\times(Ma.C)\\\\=0.001808\times0.05\times0.7625\times 1057\\\\=0.0728\frac{slug}{s}\)
A student lives in an apartment with a floor area of 60 m2 and ceiling height of 1.8 m. The apartment has a fresh (outdoor) air exchange rate of 0.5/hr. The stove in the apartment heats by natural gas. The student cooks a meal using two gas burners that each emit carbon monoxide (CO) at a rate of 100 mg/hr. The outdoor CO concentration can be assumed to be negligible (0 ppm). The initial (time = 0) indoor CO concentration can be assumed to be 0 ppm (except for problem 4). Carbon monoxide can be considered as an inert gas, i.e., it does not stick to or react with any surfaces or other gases in air.
1. Assume that the student cooks for a long enough period of time to achieve a steady-state CO concentration in the apartment. What is that concentration in ppb?
2. Assume that the student cooks for only 45 minutes and turns off both burners at that time. What is the CO concentration in ppb at the end of 45 minutes?
3. Repeat problem 2 for air exchange rates that vary from 0.1 to 1/hr and plot the concentration at 45 minutes (in ppb) versus air exchange rate.
4. Assume that for the conditions of problem 2, the student waits 25 minutes after turning the burners off and then starts cooking again with two burners on. How long will it take to reach a concentration that is 95% of steady-state under this condition?
Note that you can actually address this question with an eloquent mathematical derivation (preferred) or simply by crunching the concentration profile in a spreadsheet.
What is the concentration at 95% of steady-state?
Compare your result with the time that would be required to reach 95% of steady-state had the initial indoor CO concentration been 0 ppm.
Answer:
4
Explanation:
(25 pts) Consider the RLC circuit shown below. Derive a differential equation relating
the input x(t) and the output y(t).
(a) (10 pts) If x(t) = Vs(t) and y(t) = Vc(t).
(b) (15 pts) If x(t) = Vs(t) and y(t) = I(t).
If x(t) = Vs(t) and y(t) = Vc(t), where Vs(t) is the input voltage and Vc(t) is the voltage across the capacitor, we can derive the differential equation relating the two.
In the RLC circuit, we have a resistor (R), an inductor (L), and a capacitor (C) cnnected in series.
Using Kirchhoff's voltage law, we can write the equation:
Vs(t) VR(t) + VL(t) + VC(t)
Where VR(t) is the voltage across the resistor, VL(t) is the voltage across the inductor, and VC(t) is the voltage across the capacitor.
Since y(t) = Vc(t), we can rewrite the equation as:
Vs(t) = VR(t) + VL(t) + y(t)
ow let's express each component of the circuit in terms of its voltage and current.
\(VR(t) = IR(t) * RVL(t) = L * dI(t)/dtVC(t) = (1/C) ∫[0 to t] I(t') dt'\)
Substituting these expressions back into the equation, we have:
\(Vs(t) = IR(t) * R + L * dI(t)/dt + (1/C) ∫[0 to t] I(t') dt' + y(t)\)
Rearranging the equation and assuming ideal components, we get:
\(L * dI(t)/dt + IR(t) * R + (1/C) ∫[0 to t] I(t') dt' + y(t) = Vs(t)\)
Differentiating both sides of the equation with respect to time, we get:
\(L * d²I(t)/dt² + R * dI(t)/dt + (1/C) * I(t) + dy(t)/dt = dVs(t)/dt\)
This is the derived differential equation relating the input x(t) = Vs(t) and the output y(t) = Vc(t) for the given RLC circuit. If x(t) = Vs(t) and y(t) = I(t), where Vs(t) is the input voltage and I(t) is the current flowing through the circuit, we can derive the differential equation relating the two.
Using Kirchhoff's voltage law, we can write the equation:
\(Vs(t) = VR(t) + VL(t) + VC(t)\)
Since y(t) = I(t), we can rewrite the equation as:
\(Vs(t) = VR(t) + VL(t) + (1/C) ∫[0 to t] y(t') dt'\)
Now let's express each component of the circuit in terms of its voltage andcurrent.
\(VR(t) = IR(t) * RVL(t) = L * dI(t)/dtVC(t) = (1/C) ∫[0 to t] I(t') dt'\)
Substituting these expressions back into the equation, we have:
\(Vs(t) = IR(t) * R + L * dI(t)/dt + (1/C) ∫[0 to t] I(t') dt'\)
Differentiating both sides of the equation with respect to time, we get:
\(L * d²I(t)/dt² + R * dI(t)/dt + (1/C) * I(t) = dVs(t)/dt\)
This is the derived differential equation relating the input x(t) = Vs(t) and the output y(t) = I(t) for the given RLC circuit.
To learn more about capacitor click on the link below:
brainly.com/question/16810255
#SPJ11
Anybody know anything?
Answer:
1. Be sure to use the correct type and size of screwdriver on every kind of screw to avoid injury to yourself or damage to equipment.
2. It is also unsafe to carry screwdrivers in pockets or to use them around moving machinery.
3. Screwdrivers are not safe to use as hammers or chisels or for prying.
Explanation:
A workbar with 5.0 in diameter and 48 in length is chucked in an engine lathe and supported at the opposite end using a live center. A 40.0 in portion of the length is to be turned to a diameter of 4.75 in one pass at a speed = 400 ft/min and a feed = 0.012 in/rev. Determine: (a) the required depth of cut, (b) cutting time, and (c) metal removal rate.
Answer:
b
Explanation:
Question 3 (5 points)
Two HVAC/R technicians are discussing the use of flaring tools. Technician A says
that a flaring tool is used to form the end of piece of copper tubing to allow it to be
connected using a flare nut and fitting. Technician B says that a double flare is used
on connections that will be repeatedly loosened and retightened. Which one of the
following statements is correct?
Only Technician A is correct.
Only Technician B is correct.
Both Technician A and Technician B are correct.
Neither Technician A nor Technician B is correct.
Answer:
Technician A is corect
Explanation:
Because he said the correct reason
The flaring tube connection is made with the connection from the copper end of the tube in the nut and fitting. Hence, option A is correct.
What are flaring tools?Flaring tubes are the tools that are made for the formation of the joining in the two tubes. They are used to make connections or fittings.
The use of a flaring tube is made with the formation of the copper tube to be connected with the nut and the fitting. Thus technician A is correct. Hence, option A is correct.
Learn more about flaring tools, here:
https://brainly.com/question/13610286
#SPJ2
The coefficient of friction is found by ?
Answer:
The formula to calculate the coefficient of friction is μ = f÷N. The friction force, f, always acts in the opposite direction of the intended or actual motion, but only parallel to the surface.
the effects of noncondensible gases in the refrigeration system are which of the following? you may select more than one.
Noncondensible gases in a refrigeration system can have several detrimental effects. One major effect is reduced system efficiency. These gases, such as air or other contaminants, can accumulate in the system and hinder the heat transfer process. They act as insulators, reducing the system's ability to absorb and release heat effectively. As a result, the refrigeration cycle becomes less efficient, requiring more energy input to achieve the desired cooling effect.
Another effect is increased compressor workload. Noncondensible gases cause the compressor to work harder to achieve the desired pressure levels. The presence of these gases can lead to increased compression ratios, which require higher energy consumption and put additional strain on the compressor. This can shorten the compressor's lifespan and increase the risk of mechanical failures.
Noncondensible gases can also cause system instability. As the gases accumulate, they can create pressure imbalances within the system, leading to fluctuations in temperature and pressure. This instability can affect the system's overall performance and make it difficult to maintain a consistent cooling effect.
Furthermore, noncondensible gases can cause issues with oil circulation in the system. They can mix with the lubricating oil, reducing its viscosity and impairing its ability to lubricate moving parts effectively. This can result in increased friction, wear, and potential damage to components.
Overall, the presence of noncondensible gases in a refrigeration system can lead to reduced efficiency, increased compressor workload, system instability, and problems with oil circulation. It is important to regularly check and purge the system to minimize the presence of these gases and maintain optimal performance.
Learn more about Noncondensible Gases :
https://brainly.com/question/31376341
#SPJ11
Which of these credit building options do you personally think is the easiest method that you can see yourself doing? Explain your reasoning.
Answer:
Explanation:
Your 3-B Annual Credit Reports & Scores with Enhanced Credit Report Monitoring.
Trusted by Millions
The credit building options that I think is the easiest method that you can see yourself doing is Secured credit cards.
What is the Secured credit cards?Secured credit cards are known to be a type of card that are said to be backed by a specific refundable security deposit.
This kind of deposit is known to limit or lower the lender's risk and thus makes it better for people who do not have credit or when they do not qualify for that type of credit. This credit option is easier to get when compared to unsecured cards, as it does not need a lot of requirement.
Learn more about Secured credit cards from
https://brainly.com/question/1985056
"Como define al ser Humano, la Religión, la biología y la filosofía." y es religion Y urgenteeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
Explanation:
Los seres humanos siempre han tenido la necesidad de explicar y comprender los hechos sobre el mundo, ellos mismos y la naturaleza. La religión se configura como un conjunto de creencias comunes a una comunidad, que busca conectar al hombre con una fe en una divinidad superior que explique una visión y construcción del mundo. En sentido antropológico, la religión es una construcción evolutiva de parámetros sociales y dogmáticos como búsqueda de la creación de un sentido de pertenencia social, además de la búsqueda de la comprensión de uno mismo y del desarrollo espiritual.
La biología y la filosofía surgen como conceptos amplios que buscan explicar otros conceptos sobre la ciencia de manera sistemática, diferente a buscar una comprensión del mundo a través de la religión. La filosofía como concepto de que el hombre puede comprender el mundo a través de sus propias visiones y descubrimientos, desarrollando el pensamiento crítico y la búsqueda del conocimiento, que desarrolló las ciencias, entre ellas la biología que ayudó en la comprensión de parámetros esenciales para la calidad de vida humana, como la medicina por ejemplo.
Entonces hay una convergencia de los conceptos de religión, biología y filosofía, y es posible que el hombre crea en cada uno sin que el otro concepto se vea afectado.
what process variable is affected when the cooling tower performance has an increase in ambient temperature that causes and increase in cooling tower demands
The process variable that is affected when the cooling tower performance has an increase in ambient temperature is lowering the efficiency of the condenser and reducing the cooling power.
The factors that is influenced performance of cooling tower are:
RangeHeat loadAmbient wet-bulb temperature or relative humidity.Approach.The temperature difference between the hot water inlet and cold water outlet at the tower is called a range. The temperature of tower's ambient is generally 4 ° C to 6 ° C (or even higher) less than the ambient temperature. Because of the temperature is cool, the cooling tower ready to cool the water at a temperature below ambient temperature. The impact of ambient temperature makes energy consumption increase.
Learn more about ambient temperature: https://brainly.com/question/14039991
#SPJ4
Applications represent the most common avenue for users, customers, and attackers to access data, which means you must build the software to enforce the security policy and to ensure compliance with regulations, including the privacy and integrity of both data and system processes. Regardless of the development model, the application must validate all input. Certain attacks can take advantage of weak validation. One such attack provides script code that causes a trusted user who views the input script to send malicious commands to a web server. What is this called?Group of answer choicesDistributed denial of service (DDoS)Cross-site scripting (XSS)Cross-site request forgery (XSRF)Structured Query Language (SQL) injection
Malicious scripts are injected into otherwise trustworthy and innocent websites in Cross-Site Scripting (XSS) attacks.
XSS attacks take place when an attacker sends malicious code, typically in the form of a browser-side script, to a separate end user using an online application. These attacks can be successfully conducted everywhere a web application incorporates user input without verifying or encoding it into the output it produces. A malicious script can be sent to an unwary user by an attacker using XSS. The end user's browser will run the script regardless of the fact that it shouldn't be trusted. The malicious script is able to access any cookies, session tokens, or other sensitive data stored by the browser and used with that site since it believes the script is from a reliable source. These scripts have the ability to completely change HTML page content.
Learn more about malicious here:-
https://brainly.com/question/29848232
#SPJ4
For an electrical system, short dashed lines indicate?
A solid line around a component indicates that the component is complete. A dashed line around the component indicates that the component is being shown is not complete.
How do I complete a database Part 1?
Ragman assigns the mission "Database - Part 1" in Escape From Tarkov. You are asked to get the cargo manifests for Goshan, OLI, and IDEA from Interchange. Contents. Database for Escape from Tarkov: Part 1 Quest Information.
How do I complete a database Part 1?You can keep information on a certain topic in an organized way using a database. It's fantastic when you need to keep a computer system's worth of searchable data or information. Many systems in use today employ databases.
A database is used to store user information on nearly all popular websites with a large user base and almost every online store that sells things. Most databases comprise one or more tables, each of which may have a number of unique fields.
To know more about Database, visit:
https://brainly.com/question/518894
#SPJ4
What needs to be done before joining a fitting and pipe using socket fusion?
Before joining a fitting and pipe using socket fusion, it is important to ensure that both the fitting and pipe are clean and free from any debris or contaminants. Additionally, the correct size fitting and pipe must be used to ensure a proper fit.
Socket fusion is a method of joining plastic pipes and fittings together by heating the material and then pressing the heated ends together to form a strong bond. Before the socket fusion process begins, it is important to prepare both the fitting and pipe by ensuring they are clean and free from any debris or contaminants.
This can be achieved by using a specialized cleaning tool or wiping the surfaces with a clean cloth. Additionally, it is crucial to use the correct size fitting and pipe to ensure a proper fit and prevent any leaks or issues in the future. Proper preparation of the materials is crucial to ensuring a successful socket fusion joint.
For more questions like Socket click the link below:
https://brainly.com/question/29658250
#SPJ11
a ____ shovel is intended for moving loose material.
The answer to the question: "a ____ shovel is intended for moving loose material"
A scoop shovel is intended for moving loose material.
Learn more about loose material: https://brainly.com/question/17563681
#SPJ11
A student places a piece of a potato into a container of hydrogen peroxide. One observation the student makes is that bubbles form around the potato. The presence of bubbles might indicate the formation of a new substance because bubbles
a - Group of answer choices always rise to the top of a liquid.
b- are almost always perfectly spherical.
c- could show that a gas is forming.
d- usually burst after a few minutes.
during a call, a piece of equipment fails. you are able to adapt and improvise to provide the care needed. as a stress coping mechanism, you have demonstrated:
The stress coping mechanism demonstrated in this situation is adaptability and improvisation.
Adaptability and improvisation are crucial stress coping mechanisms in dynamic and unpredictable situations. When a piece of equipment fails during a call, being able to adapt means quickly adjusting one's approach to meet the immediate needs of the situation. It involves thinking on one's feet, assessing the available resources, and making necessary changes to ensure the required care is provided.
In this scenario, the individual demonstrated adaptability by swiftly recognizing the equipment failure and immediately shifting their focus towards finding alternative solutions.
Rather than becoming overwhelmed or paralyzed by the setback, they remained calm and flexible, allowing them to think creatively and consider different options to provide the necessary care.
Improvisation complements adaptability by enabling the person to make do with the available resources at hand. It involves utilizing ingenuity and resourcefulness to create temporary solutions or workarounds when faced with unexpected challenges.
In this case, the individual likely drew upon their knowledge and experience to come up with innovative ways to compensate for the equipment failure. They might have utilized alternative tools or techniques, improvised with existing equipment, or sought assistance from colleagues to ensure the quality of care was not compromised.
Learn more about adaptability and improvisation
brainly.com/question/32970822
#SPJ11
b) 23.5 years + 2.6 light years
Hey guys can anyone list chemical engineering advancement that has been discovered within the past 20 years
There are 22 people in the classroom 12 are we
toals 5 are doing book work 4 are playing on their phones. 1 is sleeping. How
many people have to wear safety glasses?
A1
89
C 12
D 22
write a paragraph about what this passage is about?
Accurate estimates of cost are vital to the suc- cess of a construction project. Developing such estimates in great detail is the responsibility of the construction estimator. Usually employed by a gen- eral contractor, the construction estimator factors in everything from the price of lumber to the cost of renting a large crane for a day, the labor pay rates to insurance coverage, and expected loss of time resulting from bad weather. The resulting estimate is used as the basis for the contractor to competitively bid on the construction contract. For firms building single homes or residential developments, such an estimate is used to set the selling price of the homes. Construction estimators usually begin with a set of detailed building plans that provide dimensions and other information needed to begin the estimate. In most cases, the estimator also visits the site. This visit provides information on terrain, site access, drainage, and the availability of utilities. Next, careful analyses of material and labor requirements are done. These are called takeoffs and are entered on standard estimating forms. The estimator must identify and enter on the forms the exact quantities of each item that the contrac- tor must provide. If portions of the work (such as plumbing or electrical) are subcontracted, the esti- mator must usually analyze the bids submitted by the subcontractors. Decisions involving sequenc- ing of operations must be made, since improperly scheduled equipment, materials, or work crews may cause delays and increased costs. Allowances must be made for shipping delays, waste and damage to materials, weather problems, and so on. While most construction estimators are employed by building contractors, some work for large architec- tural or engineering firms. Estimators may also operate their own consulting businesses, providing fee-based services to contractors, government agencies, and building owners or financing organizations. Educational requirements for construction esti- mators usually consist of a degree in a field such as construction management, engineering, or archi- tecture. A strong aptitude for mathematics and pro- ficiency with computer software are also valuable assets. Many estimators also have practical expe- rience in construction work, giving them familiarity with materials, job practices, and the various spe- cialty trades. Additional on-the-job training is usually provided, since each company has its own specific way of preparing and presenting estimates. Professional certification is voluntary, but ben- eficial. Such certification is administered by two professional organizations—the Association for the Advancement of Cost Engineering and the Society of Cost Estimating and Analysis. The requirements vary, but include a number of years of professional experience and passing an examination.
The inference is that the summary of the passage is that accurate estimates of cost are vital to the success of a construction project.
What is an inference?It should be noted that an inference simply means the conclusion that can be deduced based on the information that's given by the author.
It was stated in the passage that developing accurate estimates in great detail is the responsibility of the construction estimator.
Construction estimators usually begin with a set of detailed building plans that provide dimensions and other information needed to begin the estimate.
Therefore, the inference is that the summary of the passage is that accurate estimates of cost are vital to the success of a construction project
Learn more about inference on:
brainly.com/question/25280941
#SPJ1
The oldest known fabricated shelter is located at: Question 1 options: Dolni-Vestonice Lascaux Terra Amata Lepenski Vir
The oldest known fabricated shelter is located at Dolni-Vestonice. Dolni-Vestonice is an important Upper Paleolithic site situated in the Czech Republic. The site is in a valley of the Pavlov Hills in Moravia on the Dyje River floodplain. The site is well known for its numerous Palaeolithic archaeological discoveries, including ceramics, bone and stone artifacts, and other artifacts.
The site is notable for its permanent occupation by humans during the Upper Paleolithic era, as well as the development of Venus figurines, a significant element of Palaeolithic art. The site is important for researchers because it offers a comprehensive understanding of Palaeolithic Europe's climate and environmental conditions, as well as its inhabitants' customs and lifeways.
The earliest excavations at Dolní Věstonice were conducted in 1924 by Karel Absolon, a Czech archaeologist. Absolon discovered numerous artifacts, including a human bone, stone tools, ceramics, and figurines, that spanned from the Gravettian to Magdalenian periods, about 30,000 to 13,000 years ago.Furthermore, in 1988, a housing structure dating back to around 26,000 years ago was discovered at the Dolni-Vestonice site, making it the oldest known fabricated shelter to date. It was constructed with mammoth bones and had a circular floor plan.
To know more about oldest visit:
https://brainly.com/question/25044090
#SPJ11
Question 18 of 25
If you see an increase in traffic, step in and direct traffic to ensure safety. Is this a
safe or unsafe practice?
Select the best option.
O
Safe
Unsafe
We are required to explain if it is safe or unsafe to see an increase in traffic, step in and direct traffic to ensure safety.
Increase in traffic is the high influx of vehicles on the road. This means the number of vehicles using the road at a particular time is much. Traffic causes slow movement of vehicles and lack of patient of drivers could lead to accident.It is safe to direct traffic when there is an increase in traffic if you are a professional traffic worker. Meanwhile, it is very unsafe for a person who is not a professional traffic worker to direct traffic.Therefore, it is encouraged for only traffic officials to direct traffic.
Read more:https://brainly.com/question/23346590
Answer:
Unsafe
Explanation:
deep invasion lead to???
Answer:
2
Explanation:
usjshshshjeoeieieiiekeiekeiekekekekekkske
Answer:
2
Explanation:
High separation between deep...........
The device which converts mechanical energy into energy which runs out microwave oven is : (a) electric motor. (b) alternator. (c) turbine.
The device that converts mechanical energy into energy that runs a microwave oven is an electric motor (A). Electric motors are used in a wide variety of applications, including household appliances, HVAC systems, HVAC systems, and robotics.
ExplanationAn electric motor converts electrical energy into mechanical energy by using the principles of electromagnetic induction. When an electric current is passed through the motor's coils, it creates a magnetic field that interacts with the field of a stationary magnet to produce rotational motion. The rotational motion of the motor's shaft is used to power the components of the microwave oven, such as the turntable and fan.
Other options:
An alternator, on the other hand, is a device that converts mechanical energy into electrical energy. It is commonly used in vehicles to charge the battery and power the electrical systems.A turbine is a device that converts the energy of a moving fluid, such as water or steam, into rotational motion. While turbines can be used to generate electrical power, they are not typically used in the operation of a microwave oven.Learn more about electric motor on:
https://brainly.com/question/7645396https://brainly.com/question/18619348https://brainly.com/question/3579326Assignment 1: Structural Design of Rectangular Reinforced Concrete Beams for Bending
Perform structural design of a rectangular reinforced concrete beam for bending. The beam is simply supported and has a span L=20 feet. In addition to its own weight the beam should support a superimposed dead load of 0.50 k/ft and a live load of 0.65 k/ft. Use a beam width of 12 inches. The depth of the beam should satisfy the ACI stipulations for minimum depth and be proportioned for economy. Concrete compressive strength f’c = 4,000 psi and yield stress of reinforcing bars fy = 60,000 psi. Size of stirrups should be chosen based on the size of the reinforcing bars. The beam is neither exposed to weather nor in contact with the ground, meaning it is subjected to interior exposure.
• Use the reference on "Practical Considerations for Rectangular Reinforced Concrete Beams"
• Include references to ACI code – see slides from second class
• Include references to Tables from Appendix A
• Draw a sketch of the reinforced concrete beam showing all dimensions, number and size of rebars, including stirrups.
Answer:
Beam of 25" depth and 12" width is sufficient.
I've attached a detailed section of the beam.
Explanation:
We are given;
Beam Span; L = 20 ft
Dead load; DL = 0.50 k/ft
Live load; LL = 0.65 k/ft.
Beam width; b = 12 inches
From ACI code, ultimate load is given as;
W_u = 1.2DL + 1.6LL
Thus;
W_u = 1.2(0.5) + 1.6(0.65)
W_u = 1.64 k/ft
Now, ultimate moment is given by the formula;
M_u = (W_u × L²)/8
M_u = (1.64 × 20²)/8
M_u = 82 k-ft
Since span is 20 ft, it's a bit larger than the average span beams, thus, let's try a depth of d = 25 inches.
Effective depth of a beam is given by the formula;
d_eff = d - clear cover - stirrup diameter - ½Main bar diameter
Now, let's adopt the following;
Clear cover = 1.5"
Stirrup diameter = 0.5"
Main bar diameter = 1"
Thus;
d_eff = 25" - 1.5" - 0.5" - ½(1")
d_eff = 22.5"
Now, let's find steel ratio(ρ) ;
ρ = Total A_s/(b × d_eff)
Now, A_s = ½ × area of main diameter bar
Thus, A_s = ½ × π × 1² = 0.785 in²
Let's use Nominal number of 3 bars as our main diameter bars.
Thus, total A_s = 3 × 0.785
Total A_s = 2.355 in²
Hence;
ρ = 2.355/(22.5 × 12)
ρ = 0.008722
Design moment Capacity is given;
M_n = Φ * ρ * Fy * b * d²[1 – (0.59ρfy/fc’)]/12
Φ is 0.9
f’c = 4,000 psi = 4 kpsi
fy = 60,000 psi = 60 kpsi
M_n = 0.9 × 0.008722 × 60 × 12 × 22.5²[1 - (0.59 × 0.008722 × 60/4)]/12
M_n = 220.03 k-ft
Thus: M_n > M_u
Thus, the beam of 25" depth and 12" width is sufficient.
What visual clue would alert a pilot to the presence of large supercooled water droplets?
A. Formation of a glossy, transparent ice
B. Loss of RPM or manifold pressure due to induction icing
C. Entering an area of fog.
The visual clue that would alert a pilot to the presence of large supercooled water droplets is the formation of a glossy, transparent ice on the aircraft's surfaces.
These supercooled water droplets can adhere to the aircraft's surfaces, freeze on contact and form a thin layer of ice that is difficult to detect. The glossy appearance of the ice can indicate the presence of supercooled water droplets. However, it's important to note that this is not always a reliable indicator, as other types of ice can also appear glossy.
Pilots can also experience a loss of RPM or manifold pressure due to induction icing, which is caused by the formation of ice in the engine's air intake system. This can lead to engine failure if not addressed immediately. Therefore, it's important for pilots to be aware of the potential for icing conditions and take appropriate precautions, such as avoiding supercooled water droplets altogether.
Entering an area of fog may not necessarily indicate the presence of supercooled water droplets, as fog can be formed by a variety of weather conditions. However, pilots should still exercise caution when flying in foggy conditions and be prepared for potential icing hazards.
Learn more about precautions here: https://brainly.com/question/23111692
#SPJ11
The customer requests that 18 percent KCL water be pumped for 115 barrels displacement fluid. How many pounds of 18% KCL are required to be blended into this water to obtain 18 percent KCL by weight of solution? (Note: For most applications, salt solutions are calculated based on the weight of the water.)
To obtain 18% KCL by weight of solution for 115 barrels of water, approximately 20,070 pounds of 18% KCL need to be blended.
To calculate the amount of 18% KCL required, we need to determine the weight of the water and then find 18% of that weight. First, we need to know the weight of one barrel of water. Assuming a standard conversion factor of 1 barrel of water weighing approximately 42 gallons (or 350.6 pounds), 115 barrels of water would weigh approximately 40,379 pounds. To obtain 18% KCL by weight, we need to blend in 18% of 40,379 pounds, which amounts to approximately 7,268 pounds. However, since the initial 18% KCL solution is only 18% KCL, we divide 7,268 pounds by 0.18 to find that approximately 20,070 pounds of 18% KCL are required
To know more about KCL click the link below:
brainly.com/question/17029463
#SPJ11